Professional Line Marking Melbourne

Measured First. Painted Right.

Car parks, warehouses, factories and sports courts. Based in Thomastown.

Your car park speaks to your customer before you do.

Before and after of an open area of a retail car park, one frame above the other. Before: dark asphalt in daylight where the bay lines have worn back to faint broken dashes, with parked cars and shopfronts beyond. After: the same ground at night, set out in continuous white bay lines, with a marking crew and cones at the far end.
Car park bays re-marked at night — more before and after

Request a quotation

A quotation is issued in writing within one business day of the site visit.

  • Site visit at no charge
  • Written dimensional review
  • No obligation

Site plans or photos. Send them to info@konturlinemarking.com.au and they will be read alongside this enquiry. Say in the box above that they are coming, and anything in them will be checked on the site visit.

The same car park, before and after

Photographed from one position, so the difference is verifiable.

Bare concrete car park surface, worn smooth, with only faint ghosts of the previous bay markings left in it.

Before

The same car park surface after marking, with white bays, bay dividers and a long white edge line along the kerb.

After

A car park re-marked to the layout already approved for the site. Both frames are the same camera position, before the work and after it.
Worn asphalt in a retail car park, cracked across the middle, with the old bay markings reduced to broken fragments of white.

Before

The same asphalt after marking, photographed at night, with crisp white bay lines and a continuous edge line running along the kerb.

After

A retail car park on asphalt, marked overnight. The surface in the first frame has cracked and the old marking has worn back to fragments; the second frame is the same ground after the set-out.

What we do on site

Car parks, warehouses, sports courts and the set-out behind them.

Warehouses and Factories

Floor marking for aisles, walkways, racking lines and hazard areas, marked in sections around your operation. Walkways and crossings.

Sports Courts

Basketball, netball, tennis, pickleball and multi-sport courts, and synthetic turf re-marking, set out from the rules of each sport.

Plans and Set-Out

Layouts measured and chalked from the approved plan and checked before paint, with a written dimensional review.

How a job runs

Five steps, the same on every site.

  1. STEP 1

    Site Review

    We visit at no charge, measure what is there and check it against the approved plan or the rules of the sport. The quotation follows within one business day of the visit.

  2. STEP 2

    Drawing and Set-Out

    The layout is taken from the approved plan or the rules of the sport, chalked on the surface and checked before any paint.

  3. STEP 3

    Preparation

    The surface is swept, blown down and washed where needed. Preparation is part of the price, not an extra.

  4. STEP 4

    Marking

    Lines, symbols and colours are applied to the set-out, staged around the hours the site needs to stay open.

  5. STEP 5

    Handover

    You receive before and after photographs and a written note of the principal dimensions and where they came from.

The work itself

What car park and warehouse line marking actually involves.

Car park line marking across Melbourne

Most car park work is re-marking rather than a new layout: the bays are already there and the paint has worn back to traces. The temptation is to follow what is left, but a car park that has been marked over itself a few times has drifted, so the set-out is taken from the approved plan and chalked before any paint is applied. Where no plan survives, the geometry is measured against the standards the layout was built to and the difference is written down rather than painted over.

Warehouse and factory floor marking

A sealed concrete floor is a different surface from asphalt and a different job from a car park. Aisles, racking lines, pedestrian walkways and keep-clear zones have to survive forklift traffic, so the floor is cleaned and dry before anything goes down and the sequence is planned around when the building can be empty. Warehouse and factory floor marking is usually staged in sections for that reason.

Parking bays and accessible spaces

A bay is a dimension before it is a line. Accessible bays carry more than a symbol: the shared area beside them, the bollard or sign that goes with them, and the clearances around them are what make the space usable, and they are set out to the AS 2890 series rather than to whatever fitted. Accessible bays and shared areas are the part of a car park most often marked at the wrong width.

Walkways, arrows and numbering

Everything that tells a driver or a pedestrian where to go is marking too: directional arrows, hatched zones, crossings, keep-clear boxes and bay numbers. These wear faster than bay lines because they sit in the wheel path, so they are often the first thing to need re-marking even where the bays still read.

Re-marking, or a new set-out

The two are priced and planned differently. Re-marking follows a layout that already exists and can usually be done in a single visit. A new set-out starts from a plan on bare surface, and the measuring takes longer than the painting. Which one a site needs is decided at the visit, not over the phone.

How a quotation is arrived at

The site is measured before a figure is written, which is why the quotation does not move afterwards and why there is no variation for something a walk-around should have found. The written dimensional review that comes out of that visit sets down what was measured and where it sits against the plan, and it is yours whether or not the work goes ahead.

Where we work

Suburbs with a page of their own.

Each suburb below has its own page on car park and warehouse line marking there: what the sites in it are actually like, and which council decides the layout when a plan has to be followed.

Request a quotation

Tell us the site, and we will come and measure it.

A site visit and the written dimensional review are provided at no charge. If the numbers do not work for you, there is no obligation and no follow-up.

Reply timeA quotation is issued in writing within one business day of the site visit.

Insurance, checks and standards

  • $20M public liability insured
  • Working with Children Check
  • Marked to the AS 2890 series
  • Safe work method statement

Work is planned and run to the Victorian occupational health and safety regulations WorkSafe administers.